СОТ
Delivery complete set: Electric furnace-bath for tinning СОТ-2.7,5.2/4 И2 with lid, control panel, spare heater, passports and instructions for use on the tin bath and digital temperature controller.
Delivery conditions: Production time 15 working days after the prepayment of ..
Showing 1 to 1 of 1 (1 Pages)