Laboratory oven СНО-4,1.4.4,1/3,5 И1 with fan
№ | Specifications |
СНО-4,1.4.4,1/3,5 И1
|
|||
---|---|---|---|---|---|
1 | Rated power, kW |
2,5
|
|||
2
|
Power supply | 220 W, 50 Hz | |||
3
|
Maximum temperature in the working space, ºС |
350
|
|||
4 | Range of automatic temperature control, ºС | 40...350 | |||
5 | Dimensions of working space, length × width × height, mm | 410 × 400 × 410 (67 liters) |
|||
6 | Overall dimensions, length × width × height, no more, mm | 600 × 750 × 700 | |||
7 | Atmosphere in the working space | Air | |||
8 | Stability of the temperature control in the steady thermal conditions, without landing, ºС | ± 3 | |||
9 | Temperature distribution in the workspace in a steady state, without cages, no worse, ºС | ± 5 | |||
10 | Heating elements | Heaters TEHs | |||
11 | Availability of shelves and rails, pieces | 3 | |||
12 | Digital temperature regulator / Type of thermocouple | ТРП-08-ТП / ТХК | |||
13 | Material of inner chamber | Black steel coated with heat-resistant paint | |||
14 | Weight, kg | 50 |
Chamber laboratory oven СНО-4,1.4.4,1/3,5 И1 with fan is equipped with an automatic temperature control system based on contactless solid-state relays and digital microprocessor temperature control, which sets the temperature, sets exit time on the regime and sets the time spent on the regime. Heaters (heating elements sheathed in stainless) are arranged in recesses of the side walls of the furnace and the hearth. Furnace is made in the desktop version and is lined with modern fiber insulating materials. Working chamber of the oven is made of black steel and covered with heat-resistant paint. There are input and output (with a slide gate), holes for the removal of gaseous drying product. The fan is located on the rear wall of the furnace, and circulate air in the horizontal plane. Single door opens from left - to the right. In furnace installed rails and racks. The racks are removed from the furnace manually. Amount, shelves form and loading weight on them in agreement with Customer.
Complete set of delivery includes the furnace passport and operating instructions on electric furnace, thermostat and one spare heating element.
Delivery conditions. Production time - 20 working days from the date of prepayment 50 %. Shipment of products is carried out after 100% payment. Contractor will provide loading and customs clearance. Provides warranty (12 months) and post-warranty service.
Write a review
Your Name:Your Review: Note: HTML is not translated!
Rating: Bad Good
Enter the code in the box below: