Pit furnace СШО-10.25/12.5
Electric furnace СШО-10.25/12,5 is equipped with an automatic temperature control system based on solid-state non-contact relay and digital temperature regulators, which set the temperature, time to exit on mode and time spend on mode. Can be installed temperature regulators with access to computer using the accompanying software and interface. Furnace can be transported by truck. For easy transportation the furnace is manufactured in a modular version and can be easily installed by the Customer in place by the manufacturer's instructions.
Set of delivery includes passport and operating instructions on electric furnace and on temperature regulators, one spare heating element. Parameters of furnace can be changed in consultation with Customer after the verifying Customer specifications.
Delivery conditions. Production time - 40 working days from the date of prepayment 50 %. Acceptance of the product is carried out on the territory of manufacturer in the presence of the Customer. Shipment of the product after 100% payment. Shipping Payment by the Customer. Manufacturer provides loading and Customs Clearance. Provides warranty (12 months) and post-warranty service.
| № | Specifications |
СШО-10.25/12,5
|
|||
|---|---|---|---|---|---|
| 1 | Presence of the fan | not present (as agreed with Customer) | |||
| 2 | Rated power, kW* |
2×50 ±15
|
|||
|
3
|
Power supply | 3×380 V, 50 Hz | |||
|
4
|
Maximum temperature in the workspace, not more than, ºС |
1250
|
|||
| 5 | Range of automatic temperature control, ºС | 40...1250 | |||
| 6 | Dimensions of working space, diameter × height, mm | 1000 × 2500 | |||
| 7 | Overall dimensions, diameter × height, mm Width specified without control panel of the furnace |
2100 × 3700 | |||
| 8 | Stability of maintain the temperature at steady thermal conditions, without cages, not worse, ºС | ± 3 | |||
| 10 | The mechanism of lifting the cover | Electric drive | |||
| 12 | Heaters | Heating elements | |||
| 13 | Atmosphere in the workspace | Air | |||
| 14 | Weight of furnace, kg | 4800 | |||
Control cabinet of the furnace operation - remote, standing on the floor, with a cable length of 5 m. Heating elements are made of superfehral and placed on the tubes in the slots of the side walls of the furnace. Furnace lining is made of modern energy-saving and microporous fibrous materials, and hearth - solid refractory, that can withstand weight of cages. Door lifting mechanism - the electric drive.
Write a review
Your Name:Your Review: Note: HTML is not translated!
Rating: Bad Good
Enter the code in the box below:
.
. 